Salebi Mining
Resource
Initial NI 43-101 Mineral Resource Estimate - June 30, 2024
Area
The project consists of a single mining license covering an area of 115 km²
Deposit Type
~2.65-2.7Ga Ortho-Magmatic Intrusive Sill within Central Zone of the Limpopo Mobile Belt (Amphibolite-Granulite Facies)
Accessibility
Rail and power, airport, serviced by Selebi Phikwe (Pop. 52,000)
Botswana:
A Tier-One Mining Jurisdiction
Resource Growth Underway
Know Advantages
Operational Advantages

Permitted & Proven
Mining leases are already in place, clearing the way for rapid re-start and expansion.

Built-in Advantage
Two shafts, grid power, water, rail & road infrastructure in place.

Exploration Upside
Untested EM plates along 2 km corridor between and below Selebi North & Main - major discovery potential.

Capital Efficiency
A relatively low capital requirement makes redevelopment more cost-effective.

Technology Under Evaluation
XRT sorting is being assessed to enhance processing performance and reduce waste.

Local Team in Place
A skilled and growing local workforce is already supporting development activities.
Selebi North & Selebi Main
Resource Growth Underway
- Surface drilling program targeting BHEM plates in the untested 2 km long area between the Selebi North and Selebi Main deposits referred to as the hinge.
BHEM Targeting
Selebi Shaft Quick Facts
Opened in 1980, operational for 36 years
In total, 26.6 million tonnes (Mt) grading 0.58% Ni and 1.03% Cu was mined from Selebi (1980 to 2016)
Development Depth 1140m
Currently on care and maintenance
Selebi North Shaft Quick Facts
Mine production began in 1990. Shaft commissioned in 1998. Operational for 26 years
In total, 13.9 Mt grading 0.74% Ni and 0.66% Cu was mined from Selebi North (1990 to 2016)
Development Depth 970m
Currently on care and maintenance
Technical Reports
- Selebi Mines NI 43-101 Mineral Resource Estimate Technical Report – effective date: June 30, 2024
- Selebi Mine NI 43-101 Report
- SGS Report March 26, 2024: An Investigation into PLATSOL Processing of the Selkirk and Selebi Deposits
- SGS Report January 3, 2024: An Investigation into The Metallurgical Testwork on Samples from the Selebi and Selkirk Deposits
- SGS Report December 13, 2021: The Recovery of Copper and Nickel from Composite Samples from the Phikwe-Selebi Deposit
NI 43-101 Summary
Selebi Main Deposit
Inferred MRE: 18.89 Mt at 3.51% CuEq or 1.70% NiEq.
Selebi North Deposit
Inferred MRE: 18.89 Mt at 3.51% CuEq or 1.70% NiEq.
Inferred MRE: 5.83 Mt at 3.11% CuEq or 1.51% NiEq.
| Classification | Deposit | Tonnage Mt | Cu % | Ni % | Cu kt | Ni kt |
|---|---|---|---|---|---|---|
| Indicated | Selebi North | 3.0 | 0.90 | 0.98 | 27 | 29 |
| Inferred | Selebi Main | 18.9 | 1.69 | 0.88 | 319 | 165 |
| Selebi North | 5.8 | 0.90 | 1.07 | 52 | 62 | |
| Total Inferred | 24.7 | 1.50 | 0.92 | 371 | 227 |